• Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR
  • Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR
  • Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR
  • Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR
  • Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR

Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR

Cooling Way: Air Cooling
Control: Manual
Style: Hanging
Frequency Range: Low Frequency
Electric Current: DC
Transport Package: Fumigated Wooden Box
Customization:
Gold Member Since 2023

Suppliers with verified business licenses

Shanghai, China
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
LHM 200/63
Trademark
HDPE WELDING TECH
Origin
China
HS Code
851529000
Production Capacity
5000pieces/Year

Product Description

Product Description

LHM 200 Manual Butt Welding Machine

LHM Series Manual butt welding machines are suitable for PE & PP pipes and fittings on the building site and in the factory, with high quality aluminum casting without compromising strength.

 

Detailed Photos

 


Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPRLhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR

 
Product Parameters

 


This butt fusion welding machine has PTFE coated heating plate, adjustable and digital temperature control knob, the difference in surface temperature ≤±3ºC, handy operation. The China automatic welding machine includes main frame with all diameter of layer clamps, stand for heating plate, facing tool and heating plate.
 
LHM200/63 63mm~200mm,SDR 2.88KW 1 phase 220Volts/240Volts, 50/60Hz
Layer clamps: 200 x180,180 x160, 160x140, 140x125, 125x110, 110x90, 90x75, 75x50
Certifications

Lhm 200/630 Manual Butt Welding Machine with HDPE PE or PPR

FAQ

 

The use of pipeline hot melt butt welding machines in the pipeline industry is increasing, and it plays an increasingly important role in the market. When operating it, the first thing to pay attention to is the need for fixation and the integrity of the joint. It is necessary to fix the pipe and operate the hot melt welding machine conveniently.

1. Requirements for using hot melt butt welders

Prior to use, check if the welding machine meets the operational requirements. Then load the clamp of the same pipe diameter into the rack, set the heating plate temperature to the welding temperature, and wipe the surface of the heating plate with soft paper or cloth dipped in alcohol before heating, but be careful not to scratch the PTFE non-stick layer.

The hot melt butt welding machine should be operated according to the welding process card parameters. If necessary, adjustments should be made according to changes in weather and ambient temperature. Clean both ends with a clean cloth and place them in the clamp of the frame so that the lengths of both ends are the same. If necessary, the parts outside the clamp of the pipe can be supported to ensure that the pipe axis is at the height of the centerline of the frame, and then tighten the clamp.

Insert the milling cutter, turn on the power switch of the milling cutter first, slowly close the two pipe welding ends, apply appropriate pressure until continuous chips appear on both ends, withdraw the pressure, wait for a moment, then exit the movable frame and turn off the milling cutter power switch. The thickness of the chips should be 0.5~1.0mm, which can be adjusted by adjusting the cutting height of the milling cutter blade. Remove the milling cutter, close both ends of the pipe, and check the alignment of both ends. The displacement amount of both ends of the pipe should not exceed 10% of the wall thickness or the larger value of 1mm. To a certain extent, it can be corrected by adjusting the straightness of the pipe and the tightness of the clamp. There should be no obvious gap between the two end faces of the pipe when closing. If the above requirements are not met, milling must be carried out again until they are met.

Measure the drag force and add it to the process parameter pressure to obtain the actual used pressure. Check whether the heating plate temperature has reached the set value. After the heating plate temperature reaches the set value, insert it into the rack, apply the required pressure, and reduce the pressure to the specified value when the two sides of the coil reach the specified width, and then perform heat absorption. After the time is up, open the movable frame quickly, take out the heating plate, and then close both ends of the pipe. The switching time should be as short as possible and should not exceed the specified value. After cooling for a specified time, unload the pressure, loosen the clamp, and take out the completed pipe connection.

2. Precautions for operating pipeline hot melt butt welders

Check the coaxiality of the pipeline (the maximum amount of misalignment is 10% of the wall thickness). When the gap and misalignment of the two end faces fail to meet the requirements, the welding piece should be re-clamped, milled, and qualified before proceeding to the next step of operation.


Check whether the heating plate temperature of the hot melt butt welding machine is suitable (210ºC±10ºC), and the red indicator light on the heating plate should be lighted or flashing. After the first light on the heating plate, it is better to wait for 10 minutes for the temperature to be even.


Test the drag pressure P0 of the system and record it. The drag pressure of each welding point needs to be measured; when the drag pressure is too large, short pipes can be used to solve the problem.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now